Skip to content
- Locate pipe
- Install temporary bypass through water meters or garden spigots
- Excavate access pits at each end of the pipe section
- Clean pipe with metal chain reamer
- Inspect pipe through closed-circuit television (CCTV) inspection to map the service connections
- Insert plug in every service connection from inside the pipe using specialized robotic equipment
- Inject epoxy into the liner onsite and pull liner into place
- Form the liner by sending swabs from one end to the other
- Circulate hot water for curing
- Perform hydrostatic pressure test
- Reinstate service connections by drilling with specialized robotic equipment from inside the pipe
- Disinfect pipe
- Reconnect water distribution systems
- Remove temporary bypass
- Restore site
Go to Top